Roadmap
Last updated
Last updated
The total development time for the BananaClip platform is estimated to be six months, with a product launch expected in November 2024.
May 10th — June 18th
Concentrate on building a strong team, defining the project scope, and finalizing the product design. Gather requirements and create detailed wireframes and mockups. Choose the appropriate technology stack and develop and host finalized designs.
Assemble team, define project scope, finalize product design.
Create wireframes and high-fidelity mockups.
Choose technology stack, develop and host designs.
Develop user interface, set up version control.
June 18th — July 18th
Initiate backend development, including database design, server setup, and API creation. Design and begin implementation of economic functionality. Begin implementing game logic for the initial minigames.
Start backend development: database design, server setup.
Implement economic functionality and game logic for initial minigames.
Implement user authentication (registration, login, profile management).
July 18th — August 18th
Introduces the integration of front-end with back-end APIs, as well as refining the user interface, ensuring responsive design. Begin testing of Agario remaster and wagering functionalities.
Integrate and optimize front-end with backend.
Develop and test minigames: mechanics, graphics, sound effects.
Implement scoring systems, leaderboards, user profiles.
August 18th — September 18th
Focuses on game development. Advanced buildout and implementation of the BANA economy.
Refine and polish minigames based on feedback.
Conduct extensive testing to fix bugs and improve performance.
Finalize scoring systems and integrate minigames with the platform.
September 18th — October 18th
Initiates comprehensive performance testing and bug fixing, as well as gathering user feedback. Additionally, the implementation of mainnet Cardano tokens will be underway, focusing on secure integration and user-friendly functionality.
Perform functional and performance testing.
Fix bugs, optimize for high traffic.
Gather user feedback to improve usability and design.
Begin testing mainnet token integration.
October 18th — November
Final adjustments and refinements will be made, as well as optimizing for SEO and engaging in the marketing plan to ensure a successful launch of the website.
Complete Cardano token integration, ensure transaction security.
Conduct security audit, implement advanced security measures.
Make final adjustments based on feedback, conduct final testing.
Optimize for SEO, deploy website, and engage in marketing.